- Firmware
- Facilities
- Gobbledegook
- Examples
- Fun-With-Tech
- Whatchamacallits
- Dragons
- Innovation
- Macs
- Raspberry Pi
- Tools
- Centralization
Archived Endpoints
2026
March
IOT Building IoT Sensor Firmware Update – Science Hall
Firmware update for 120 environmental and occupancy sensors in Science Hall to address a connectivity bug and improve telemetry accuracy.
SERVER Database Cluster Storage Expansion – Oracle RAC
Adding 20 TB of SAN-backed storage to the Oracle RAC cluster hosting the student information system to address capacity warnings.
DEVICE Staff Laptop Refresh – Wave 2 Deployment
Second wave of the 2026 staff laptop hardware refresh, replacing 85 end-of-life devices across administrative departments.
IOT Smart Lighting Controller Commissioning – Library Expansion Wing
Commissioning 210 Lutron Vive wireless lighting control nodes in the newly constructed Library Expansion Wing and integrating them with the campus BAS.
DEVICE Conference Room AV Equipment Reconfiguration
Replacing aging Crestron control processors and reconfiguring HDMI matrix switches in 12 conference rooms across the Administration Building.
SERVER Linux Application Server OS Upgrade – RHEL 9
In-place upgrade of six Red Hat Enterprise Linux 8 application servers to RHEL 9 to maintain vendor support before the EOL deadline.
SERVER Windows Server Patching Cycle – March 2026
Monthly cumulative update deployment to all Windows Server endpoints in the production environment.
·